For Sale by RGI Spraybooths
Description
Construction: Pre-punched single wall panels 18 ga. galvanized steel panels Self-support airtight construction 6" O.C precision punched and assembled with 1/4" nuts and bolts. TOP-Designed to meet the requirements of EPA’s 6H Paint Rule (40CFR63 Subpart HHHHHH), RGI’ Prep station provides a controlled environment for sanding, priming and limited painting. When priming and painting, the amount of material sprayed shall not exceed one gallon in an eight-hour period.
Fans & Motors: (1) - 30” 12,900 CFM Tube-axial fan.
(1) - 2HP-3PH-240v motor High capacity exhaust & intake Directly connected to turbine
Filters: POST EXHAUST FILTERS:20'' X 25'' PAINT POCKETS- EXHAUST FILTERS: 20'' X 20'' FIBER GLASS FILTERS
Lighting: (2) upper horizontal light fixtures Energy efficient ballast 120V 60Hz. 4' light fixtures with 4 LED lamps
Dimensions: 10’ wide x 3’ Deep x 95” High
Optional Upgrades:
- Control VFD unit brings together or combines motor control devices and circuit protection. The control panel protects these devices from moisture, corrosion, dust, and other damage.
- Powder coat ultra white inside and outside the Prep-Stations. Covers all panels.
- Fire system with piping for prep station. Fire systems need to cover all working areas and ducting exhaust vents. Fire systems need to be installed be NFPA no 17
- CURTAIN 8' H Auto bay curtain with hardware and tracking for prep area or clean area. Curtain chain sewn into the bottom hem with nylon roller with 1" hook

















