go to top
The World's Leading Online Marketplace for Used, New, and Surplus Industrial Machinery & Equipment ℠

ITE, 5600, new replacement buckets, size 1-5

Manufacturer: Ite
Model: 5600
Type: 5600

No Photos Available Yet

Ask the seller to send photos of this item.

Request Photos from Seller

For Sale by Advanced Electrical & Motor Controls

Surplus Record Dealer Since 2002
Gold Level Dealer
Location: Irving, TX
Contact David Muir
Let the seller know you found their listing on Surplus Record!

Get Your Price from Advanced Electrical & Motor Controls!

Buyers Who Viewed This Listing Also Viewed:

Hoffman Electrical Panels, Main Control Panels, 2 Door Electrical Enclosure

Seller: American Industrial Sales LLC
Location: Berlin, WI
Mfr: Hoffman
Model: MAIN CONTROL PANELS
We have numerous electrical control panels of all sizes including 1, 2, 3 and 4 doors. Call for more information 9203615208 x402 or send online inquiry.

ITE/Gould/Allis-Chalmers/Furnas, 9600, Mark 1,Class 89,Mark 2,Marq 21,Mdl.90,95,95+

Seller: Denver Breaker & Supply
Location: Denver, CO
Mfr: Ite
Model: 9600

Goulds, 2 section 600 a motor con, (8) 12" MCC buckets, 480 Volts

Seller: Equipment Recovery Corp
Location: Willoughby, OH
Mfr: Goulds
Model: 2 SECTION 600 A MOTOR CON
GOULD 5640-V1A-0-106-C-0.

Jiangsu Zhenglai #GGD, ac low voltage distributi, w/(5) 400 Amps & (1) 2500 Amps Circuit Breakers, 3 Phase, 2500 Amps, 416 V, 2022

Seller: Lenmark Industries
Location: Langley, BC
Mfr: Jiangsu Zhenglai
Model: AC LOW VOLTAGE DISTRIBUTI
Year: 2022
SKU: 138627, Model: GGD, Year: 2022, Condition: Surplus New, S/N: 2201007, Voltage: 416 volts, Phase: 3-phase, kVA: 35 kVA, Amps: 2500 amps, Dimensions: 30.00 (H) x 40.00 (W) x 78.00 (L) inches, Additional :, Circuit Breakers:, - 5 x Noark M3S400T3, 400 amps, 3-poles, 600 volts, - 1 x Noark A32Q3FH2500, 2500 amps ...more

General Electric #7700, Motor Control Center, MCC, 4 Section, 600 Amp., 480 Volts

Seller: Quantum Technology
Location: Shippensburg, PA
Mfr: General Electric
Model: MOTOR CONTROL CENTER
Two sections are missing top and bottom covers, Shipping & Freight LogisticsFreight Handling: Average handling lead time is 5 business days (varies by item size, carrier used, and shipping location).Freight Inspection (Crucial): For all freight deliveries, the buyer must inspect the shipment for transit damage and ...more

Share